Barham - New Build
BackThis project was featured in Episode 7 of the Sixth Series of Channel 4's Building the Dream with Charlie Luxton.
Watch how the house progresses and how we perform in the spotlight...
Spring 2017
Plot 'A' complete and landscaping established.
![](/uploads/content/images/Barham-IMG_8231-960x720.jpg)
![](/uploads/content/images/Barham-IMG_8235-960x720.jpg)
Interior finishes...
![](/uploads/content/images/Barham-IMG_8212-960x720.jpg)
![](/uploads/content/images/Barham-IMG_8224-960x720.jpg)
![](/uploads/content/images/Barham-IMG_8222-960x720.jpg)
November 2016
Scaffold erected and shell construction started on Plot 'C'.
![](/uploads/content/images/2016-11-2-Barham-Plot-C.jpg)
![](/uploads/content/images/2016-11-Barham-Plot-C.jpg)
Scaffold down and shell complete on Plot 'A'.
![](/uploads/content/images/2016-11-2-BarhamPlotA.jpg)
![](/uploads/content/images/2016-11-BarhamPlotA.jpg)
August 2016
Blockwork for DPC and installation of drainage on Plot 'C'.
![Blockwork for DPC and drainage installation for plot C](/uploads/content/images/Barham-16-08-Blockwork-to-dpc-and-drainage---IMG_5325.jpg)
![Blockwork for DPC and drainage installation for block C](/uploads/content/images/Barham-16-08-Blockwork-to-dpc-and-drainage---IMG_5331.jpg)
![Blockwork for DPC and drainage installation for block C](/uploads/content/images/Barham-16-08-Blockwork-to-dpc-and-drainage---IMG_5328.jpg)
Roof and underfloor heating installation to Plot 'A'.
![Roofwork to plot A](/uploads/content/images/Barham-16-06-Plot-1-roof-going-on---IMG_5336.jpg)
![Roofwork to plot A](/uploads/content/images/Barham-16-06-Plot-1-roof-going-on---IMG_5337.jpg)
![Underfloor heating to plot A](/uploads/content/images/Barham-16-06-Plot-1-roof-going-on---IMG_5317.jpg)
July 2016
Preparation of the footings for Plot 'C'.
![New footings for plot c](/uploads/content/images/Barham-16-07-FootingsPlotC-IMG_4959.jpg)
![New footings for plot c](/uploads/content/images/Barham-16-07-FootingsPlotC-IMG_4960.jpg)
![New footings for plot c](/uploads/content/images/Barham-16-07-FootingsPlotC-IMG_4961.jpg)
June 2016
Installation of timber floor joists and flooring to Plot 'A' and start of construction on Plot 'B'.
![Installation of floor joists](/uploads/content/images/Barham-June-FloorJoists.jpg)
![Installation of flooring](/uploads/content/images/Barham-June-Flooring.jpg)
![Start on plot 2](/uploads/content/images/Barham-June-SecondPlot.jpg)
Brickwork to Plot 'A'.
![Start of brickwork](/uploads/content/images/Barham-PlotABrickwork-06-16-IMG_4892.jpg)
![Start of brickwork](/uploads/content/images/Barham-PlotABrickwork-06-16-IMG_4894.jpg)
![Start of brickwork](/uploads/content/images/Barham-PlotABrickwork-06-16IMG_4893.jpg)
May 2016
![Scaffolding in place ready for timber frame.](/uploads/content/images/Barham-May-Scaffolding-in-place-ready-for-timber-frame.jpg)
Scaffolding in place ready for the erection of the timber frame.
April 2016
Ground level blockwork up to DPC with foul water and soil pipes in place. Steels then positioned to support the first floor flooring joists.
![Ground level blockwork](/uploads/content/images/Barham-April-Blockwork.jpg)
![Ground level blockwork](/uploads/content/images/Barham-April-Blockwork2.jpg)
![Inserting the structural steel.](/uploads/content/images/Barham-April-Steel.jpg)
March 2016 - Plot 'A' is underway.
![](/uploads/content/images/March-Barham-Field.jpg)
We are currently building three new, four bedroom houses in Barham.